Thorn Creek Bridge Thorn Creek Bridge was the replacement of existing multiplate pipe with a cast in place concrete stiff-leg structure with MSE wing walls and 600 LF of paving. The new structure included the drilling of 14 shaft piles. The creek and wetlands had to be protected throughout the project, utilizing bypass pumping and mitigation measures. Completed Fall 2013.
US-95 Athol, ID US-95 Garwood to Sagel, Chilco & Silverwood stages, for Idaho Transportation Department. The US 95 Bridges/tunnel project is a major freeway reconstruction. Clearwater’s role in the project was to construct 3 vehicular bridges (one over a UP railroad mainline and two over the new alignement of US 95), Additionally, Clearwater built a new wildlife tunnel and extended the pedestrian tunnel under US 95. The total cast-in-place concrete on the project was about 4800CY’s. It was completed fall of 2013